
Addition Carousel
From first sums to carrying the one.
Parent guide: how to teach additionAddition, subtraction, times tables and division, turned into carnival games. Kids ages 4–10 win plush prizes, Toco the Toucan cheers them on, and every missed fact comes back until it sticks.

Welcome to the math carnival!
Free 2-minute demo · no sign-up · nothing is saved
Catch the duck with the answer!

Filling the duck pond…
The game didn’t load. Check your connection and try again.

Mini Toco

Now ask a grown-up to see the rest of the park.
Grown-ups only
In the app, this quick check keeps purchases, links and settings for grown-ups only.
Addition, subtraction, times tables and division, hidden inside carnival games kids beg to play.
80 levels, from first sums to the 12× table. Missed facts come back until they stick, and you get a clear report.
No ads. No tracking. Your child’s info stays on the device.
Page 1 of 3

80 levels, 5 booth games and 80 prizes on iPhone and iPad. Try it free for 3 days.
The playable demo needs a newer browser (Safari 16 or later, or a current Chrome, Edge or Firefox).
The park
Each zone teaches one operation in 20 short levels, with a Jumbo Prize level every fifth step.

From first sums to carrying the one.
Parent guide: how to teach addition
Take away, count back and borrow.
Parent guide: how to teach subtraction
Every times table from 0 to 12.
Parent guide: how to teach multiplication
The flip side of multiplication.
Parent guide: how to teach divisionThe games
The same math, five ways to win. Booths rotate every level, so practice never gets boring.

Tap the duck with the answer and reel it in.

Knock down the can pyramid with the right answer.

Pop the balloon that holds the answer.

Grab the plush with the answer. Jumbo Prizes live here.

Splash the clown with the right number to win.
Free in your browser
The Duck Pond is open on the web: pick a level, catch 10 ducks, earn three stars. No sign-up, no ads.





The prizes
Finish a level, win a 3D plush for My Prize Shelf: teddy bears, unicorns, dragons, rockets and more, plus trophies for big milestones.

How it teaches
Small steps, pictures before symbols, and practice that comes back at just the right time.
A missed fact returns in later games until it sticks. It’s called spaced practice.
A wrong answer gets a gentle “So close!” and another try. A hint glows after two misses.
Early levels show the problem as dots, so even a four-year-old can count to the answer.
From sums to 5 to the 12 times table, in the order schools teach them.

For grown-ups
See how your child is doing at a glance.
Safe by design
No ads. No tracking. Your child’s info stays on the device.
No banners, no videos, no pop-ups.
No accounts and no tracking. Progress stays on the device.
Every level plays without Wi-Fi.
The grown-ups area and outside links are for grown-ups only.
Sneak peek






Free for everyone
Step-by-step help for teaching each operation at home, with pictures, practice problems and grade-by-grade checklists.




Questions
Mathing is a math game for kids ages 4–10 on iPhone and iPad. It turns addition, subtraction, times tables and division practice into an amusement park with four rides, five carnival booth games and 80 plush prizes to win, hosted by Toco the Toucan.
Mathing is designed for children ages 4 to 10, roughly Pre-K through 4th grade. Each zone starts with very small numbers and counting-dot pictures, then grows step by step to two-digit sums with carrying, subtraction with borrowing, the times tables up to 12 and division facts.
Mathing is on the App Store for iPhone and iPad (iOS 17 or later): download Mathing. New subscribers start with a 3-day free trial, and you can play the free demo in your browser first.
Mathing is free to download. Full access is a subscription: $3.99 a week with a 3-day free trial for new subscribers, or $29.99 a year (about $0.58 a week). One subscription covers up to 4 kids on the same device, and you can cancel any time in your Apple Account settings. Prices are in US dollars; the App Store shows the price for your country before you subscribe.
No ads. No tracking. Your child’s info stays on the device: names, avatars and progress are never sent to us or anyone else, and there are no accounts, analytics or advertising SDKs. Subscriptions are paid through Apple, and our subscription service (RevenueCat) only receives an anonymous purchase record. Read the full privacy policy.
Yes. Once it is installed, every level, booth game and prize works without an internet connection, so it is perfect for car rides and flights.
There are no timers and kids never lose. A wrong answer gets a gentle “So close!” and another try, a hint appears after two misses, and that fact comes back in later games until it sticks.
Yes. You can add up to 4 child profiles on one device. Each child has their own levels, prizes and progress report in the grown-ups area.

Download Mathing for iPhone and iPad and try it free for 3 days. 80 levels, 5 booth games and 80 prizes are waiting.